Decommissioning Documents and Information

The following documents relate to the San Onofre Nuclear Generating Station (SONGS) decommissioning process and are grouped under the following categories:

All SCE Presentations to CEP
CEP Meeting Materials
CEP Meeting Minutes
CEP Meeting Transcripts
Correspondence / Discussions with CEP
Decommissioning Documents and Process
Emergency Planning
Industry Examples
Nuclear Fuel
Plant Security
Seismic / Tsunami
Used Fuel Update

Search by Category:


Category Document Name Date From Sender Tag
Category Document Name Date From Sender Tag
Used Fuel Updates Settlement Agreement Implementation Status Report 11/22/2017 SCE 2/16/17
Seismic / Tsunami Seismic Constraints on the Architecture of the Newport-Inglewood/Rose Canyon Fault: Implications for the Length of Magnitude of Future Earthquake Ruptures. Published in Journal of Geophysical Research, February 2017. 3/13/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Safety Evaluation Report (Geology and Seismology) related to the operation of SONGS Unit 2 & 3, US NRC Office of Nuclear Reactor Regulation. - NRC
Seismic / Tsunami Letter from NRC issuing SER for Geology and Seismology (ML13310A329), 12/31/1980 - NRC
Seismic / Tsunami Continental shelf morphology and stratigraphy offshore San Onofre, California: The interplay between rates of eustatic change and sediment supply. Published in Marine Geology, 2015. 2/11/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Segmentation and step-overs along strike-slip fault systems in the Inner California Borderlands: implications for fault architecture and basin formation. Published in Applied Geology in California: Association of Environmental and Engineering Geologists, Special Publication Number 26, 2016. 2/11/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Public Watchdogs blog post ‘Geologist Warns: A nuclear disaster at SONGS is unavoidable’ and email exchange with Charles Langley 2/11/2017 Public Watchdogs
Seismic / Tsunami SCE Position Paper on Tsunami Hazards Analysis - SCE
CEP Meeting Materials CEP Meeting Agenda (11/2/17) 9/11/17 CEP 9/14/17
CEP Meeting Materials CEP Meeting Agenda (9/14/17) 9/11/17 CEP 9/14/17
CEP Meeting Materials CEP Meeting Transcript (5/11/17) 9/6/17 CEP 5/11/17
CEP Meeting Materials CEP Meeting Transcript (2/16/17) 5/10/17 CEP 2/16/17
CEP Meeting Materials CEP Meeting Agenda (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials Decommissioning Update (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials NRC – Reactor Decommissioning Program & Inspection Program (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials CIS Development Projects: Waste Control Specialist presented by SCE (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials CIS Development Project: Eddy-Lea Energy Alliance LLC & Holtec International (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials CEP Meeting Presentation (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Materials CEP Meeting Agenda (2/16/17) 2/16/17 CEP 2/16/17
CEP Meeting Materials CEP Meeting Transcripts (9/15/16) 9/15/16 CEP 9/15/16 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Transcripts (11/10/16) 11/10/16 CEP 11/10/16 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Transcripts (3/24/16) 3/24/16 CEP 3/24/16 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Transcripts (6/22/16) 6/22/16 CEP 6/22/16 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Presentation (11/10/16) 11/10/16 CEP 11/10/16
CEP Meeting Materials Decommissioning Update (11/10/16) 11/10/16 CEP 11/10/16
CEP Meeting Materials CEP Meeting Agenda (11/10/16) 11/7/16 CEP 11/10/16
CEP Meeting Materials Strategic Advocacy Plan for CIS (11/2016) 11/10/16 CEP 11/10/16
CEP Meeting Materials Decommissioning Update 9/15/2016 9/15/16 CEP 9/15/16
CEP Meeting Materials Environmental Update 9/15/2016 9/15/16 CEP 9/15/16
CEP Meeting Materials Dry Cask Storage of Used Nuclear Fuel - 9/15/2016 9/15/16 CEP 9/15/16
CEP Meeting Materials Steve Schroeter - Wheeler North Reef Update - 9/15/2016 9/15/16 CEP 9/15/16
CEP Meeting Materials CEP Meeting Agenda - 9/15/2016 9/15/16 CEP 9/15/16
CEP Meeting Materials Decommissioning Update - 6/22/2016 6/22/16 CEP 6/22/16
CEP Meeting Materials Robert Oglesby – California Energy Commission - 6/22/2016 6/22/16 Robert Oglesby 6/22/16
CEP Meeting Materials Jack Edlow – Transportation of Spent Nuclear Fuel - 6/22/2016 6/22/16 Jack Edlow 6/22/16
CEP Meeting Materials Allison Macfarlane – Integrating the elements of the back end of the fuel cycle - 6/22/2016 6/22/16 Allison Macfarlane 6/22/16
CEP Meeting Materials CEP Meeting Agenda - 6/22/2016 6/22/16 CEP 6/22/16
CEP Meeting Materials State Lands Commission's Role in SONGS Decommissioning 3/24/16 CEP 3/24/16
CEP Meeting Materials San Onofre Environmental Review & Permitting Process 3/24/16 CEP 3/24/16
CEP Meeting Materials Economic Impact Comparison Jan 2016 3/24/16 CEP 3/24/16
CEP Meeting Materials Decommissioning Update 3/24/16 CEP 3/24/16
CEP Meeting Materials CEP Meeting Transcript 11/5/15 11/5/15 CEP 11/5/15 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Agenda 3/24/16 3/24/16 CEP 3/24/16
CEP Meeting Materials CEP Meeting Transcript 7/23/15 7/23/15 CEP 7/23/15 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Agenda 11/5/15 11/5/15 CEP 11/5/15
CEP Meeting Materials CEP Meeting Agenda 7/23/2015 7/23/15 CEP 7/23/15
CEP Meeting Materials CEP Meeting Agenda 4/16/2015 4/16/15 CEP 4/16/15
CEP Meeting Materials CEP Meeting Transcript 4/16/2015 4/16/15 CEP 4/16/15 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Agenda 1/27/2015 1/27/15 CEP 1/27/15
CEP Meeting Materials CEP Meeting Transcript 1/27/2015 1/27/15 CEP 1/27/15 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Agenda 10/14/2014 10/14/14 CEP 10/14/14
CEP Meeting Materials SCE Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14
CEP Meeting Materials Areva Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14
CEP Meeting Materials Holtec Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14
CEP Meeting Materials SONGS Units 2 & 3 - PDEP - LAR 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials SONGS Units 2 & 3 - PDEP - Exemption Request 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials NRC Interim Staff Guidance-Decommissioning 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Markey and Boxer to Macfarlane Correspondence 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Boxer to Macfarlane Correspondence 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Macfarlane to Boxer Correspondence 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Macfarlane to Markey Correspondence 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials CEP Meeting Agenda 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials CEP Meeting Transcript 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Transcripts
CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Boron Levels in Spent Fuel Pools 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Extinguishing Zirconium Fire 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Plant Water Supply 10/9/2014 10/9/14 CEP 10/9/14
CEP Meeting Materials CEP Meeting Draft Agenda 8/28/2014 8/28/14 CEP 8/28/14
CEP Meeting Materials CEP Meeting Transcript 8/28/2014 8/28/14 CEP 8/28/14 CEP Meeting Transcripts
CEP Meeting Materials CEP Workshop Agenda 7/17/2014 7/17/14 CEP 7/17/14
CEP Meeting Materials DCE Executive Summary 7/17/2014 7/17/14 CEP 7/17/14
CEP Meeting Materials EIE Executive Summary 7/17/2014 7/17/14 CEP 7/17/14
CEP Meeting Materials DCE and EIE Assumptions 7/17/2014 7/17/14 CEP 7/17/14
CEP Meeting Materials SCE Final Draft IFMP 5/22/2014 5/22/14 CEP 5/22/14
CEP Meeting Materials CEP comments on SCE draft IFMP 5/22/2014 5/22/14 CEP 5/22/14
CEP Meeting Materials SCE Position Papers on ISFSI Location, High Burnup Fuel Storage and Transportation, and Tsunami Hazard Analysis 5/22/2014 5/22/14 CEP 5/22/14
CEP Meeting Materials CEP Meeting Agenda 5/22/2014 5/22/14 CEP 5/22/14
CEP Meeting Materials CEP Meeting Transcript 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Transcripts
CEP Meeting Materials CEP Meeting Adgenda 5/6/2014 5/6/14 CEP 5/6/14
CEP Meeting Materials Workshop Notes and Action Items 5/6/2014 5/6/14 CEP 5/6/14
CEP Meeting Materials CEP Meeting Agenda 3/25/2014 3/25/14 CEP 3/25/14
CEP Meeting Materials CEP Briefing Materials 3/25/2014 3/25/14 CEP 3/25/14
CEP Meeting Materials CEP Meeting Transcript 3/25/2014 3/25/14 CEP 3/25/14 CEP Meeting Transcripts
CEP Meeting Minutes Meeting Minutes (9/14/17) 9/14/2017 SCE 9/14/17
CEP Meeting Minutes CEP Meeting Minutes (2/16/17) 4/4/17 CEP 2/16/17
CEP Meeting Minutes CEP Meeting Minutes (9/15/16) 9/15/16 CEP 9/15/16
CEP Meeting Minutes CEP Meeting Minutes (5/11/17) 5/11/17 CEP 5/11/17
CEP Meeting Minutes Meeting Minutes 11/10/16 6/22/16 SCE 6/22/16
CEP Meeting Minutes Meeting Minutes 6/22/16 6/22/16 SCE 6/22/16
CEP Meeting Minutes Meeting Minutes 3/24/16 3/24/16 SCE 3/24/16
CEP Meeting Minutes Meeting Minutes 11/5/2015 11/5/15 SCE 11/5/15
CEP Meeting Minutes Meeting Minutes 7/23/2015 7/23/15 SCE 7/23/15
CEP Meeting Minutes Meeting Minutes 4/16/2015 4/16/15 SCE 4/16/15
CEP Meeting Minutes Meeting Minutes 1/27/2015 1/27/15 SCE 1/27/15
CEP Meeting Minutes Meeting Minutes 10/14/2014 10/14/14 SCE 10/14/14
CEP Meeting Minutes Meeting Minutes 10/9/2014 10/9/14 SCE 10/9/14
CEP Meeting Minutes Meeting Minutes 8/28/2014 8/28/14 SCE 8/28/14
CEP Meeting Minutes Meeting Minutes 7/17/2014 7/17/14 SCE 7/17/14
CEP Meeting Minutes Meeting Minutes 5/22/2014 5/22/14 SCE 5/22/14
CEP Meeting Minutes Meeting Minutes 3/25/2014 3/25/14 SCE 3/25/14
Decommissioning Documents and Process California Coastal Commission (CCC) Costal Development Permit 12/4/2015 SCE
Decommissioning Documents and Process NRC: Decommissioning Nuclear Power Plants 6/17 SCE
Decommissioning Documents and Process NEI Fact Sheet – Decommissioning Nuclear Power Plants 8/1/16 NEI
Decommissioning Documents and Process Advance Notice of NRC Decommissioning Rulemaking: Regulatory Improvement for Decommissioning Power Reactors 11/19/2015 NRC
Decommissioning Documents and Process John Kotek letter to CEP 7/30/15 DOE
Decommissioning Documents and Process Decommissioning Study Fact Sheet 11/5/15 SCE
Decommissioning Documents and Process Full Economic Impact Analysis 11/5/15 Beacon Economics
Decommissioning Documents and Process NRC Letter to SCE regarding approval of the San Onofre Irradiated Fuel Management Plan 8/19/15 NRC
Decommissioning Documents and Process NRC Letter to SCE regarding acceptance of the Post-Shutdown Decommissioning Activities Report 8/20/15 NRC
Decommissioning Documents and Process 1995 SONGS Geotech Report 7/21/15 SCE
Decommissioning Documents and Process CCC CDP Waiver Staff Recommendations & Meeting Notice 3/5/15 2/26/15 California Castal Commission (CCC)
Decommissioning Documents and Process SCE Submitted Post-Shutdown Decommissioning Activities Report 9/23/14 9/23/14 SCE 8/28/14
Decommissioning Documents and Process SCE Submitted Irradiated Fuel Management Plan 9/23/14 9/23/14 SCE
Decommissioning Documents and Process SCE Submitted Decommissioning Cost Estimate 9/23/14 9/23/14 SCE
Decommissioning Documents and Process Substance and Process at San Onofre: Panel Discussion with Invited Technical Experts and SCE on PSDARs, EIEs, and DCEs Introduction 7/17/14 7/17/14 SCE 7/17/14
Decommissioning Documents and Process SONGS Decommissioning Community Engagement Panel Charter 3/25/14 CEP
Decommissioning Documents and Process SCE Decommissioning Core Principles and Values 1/1/14 SCE
Decommissioning Documents and Process Executive Summary of San Onofre Irradiated Fuel Management Plan - SCE 5/22/14
Decommissioning Documents and Process SCE Final Draft San Onofre Irradiated Fuel Management Plan 5/15/14 SCE 5/22/14
Decommissioning Documents and Process Fact sheet with directions to meeting venue 5/15/14 SCE 5/22/14
Decommissioning Documents and Process Executive Summary SCE Draft San Onofre Decommissioning Cost Estimate - SCE
Decommissioning Documents and Process SCE Draft Decommissioning Cost Estimate 5/21/14 SCE 8/28/14
Decommissioning Documents and Process Executive Summary of SCE Draft Environmental Impacts Evaluation 6/2/14 SCE
Decommissioning Documents and Process SCE Draft Environmental Impact Evaluation 6/2/14 SCE 8/28/14
Decommissioning Documents and Process SCE Draft Post-Shutdown Decommissioning Activities Report 8/1/14 SCE
Decommissioning Documents and Process Assumptions for SCE San Onofre Decommissioning Cost Estimate and Environmental Impacts Evaluation 7/18/14 SCE
Decommissioning Documents and Process NRC Oversight of DCE, EIE, and PSDAR and What to Expect in the Coming Months and Years - Watson Presentation 7/17/14 NRC 7/17/14
Decommissioning Documents and Process EIE Development / Process - Leiba Presentation 7/17/14 URS 7/17/14
Decommissioning Documents and Process DCE Development / Process - Smith Presentation 7/17/14 Energy Solutions CB & I 7/17/14
Decommissioning Documents and Process California Senate Energy, Utilities & Communications Committee Hearing - Brown / Palmisano Presentations 8/12/14 SCE
Decommissioning Documents and Process NRC Decommissioning Nuclear Power Plants Brochure - -
Decommissioning Documents and Process NRC Frequently Asked Questions About the Waste Confidence Generic Environmental Impact Statement (GEIS) and Rulemaking - -
All SCE Presentations to CEP Briefing on Economic Impact Study 11/5/15 SCE
All SCE Presentations to CEP Decommissioning Update 11/5/15 SCE 11/5/15
All SCE Presentations to CEP CEP Presentation - Decommissioning Update 7/23/15 SCE 7/23/15
All SCE Presentations to CEP Emergency Planning and Preparedness Presentation 7/23/15 SCE 7/23/15
All SCE Presentations to CEP Dry Fuel Storage Defense in Depth 7/23/15 SCE 7/23/15
All SCE Presentations to CEP San Onofre Security Briefing 4/16/15 SCE 4/16/15
All SCE Presentations to CEP CEP Presentation - Decommissioning Update 4/16/15 SCE 4/16/15
All SCE Presentations to CEP Status of SONGS Permanently Defueled Emergency Plan Submittal 10/9/14 SCE
All SCE Presentations to CEP SCE Presentation - Emergency Planning for San Onofre 10/9/14 SCE
All SCE Presentations to CEP CEP Presentation - 8/28/14 8/28/14 SCE 8/28/14
All SCE Presentations to CEP CEP Presentation - 3/25/14 3/25/14 SCE 3/25/14
All SCE Presentations to CEP SONGS Decommissioning Project - 5/6/14 5/6/14 SCE 5/6/14
All SCE Presentations to CEP CEP Presentation - 5/22/14 5/22/14 SCE 5/22/14
All SCE Presentations to CEP Independent Spent Fuel Installation and Technology Options - 7/17/14 7/17/14 SCE 7/17/14
All SCE Presentations to CEP Overview of SCE's Draft EIE and DCE - 7/17/14 7/17/14 SCE 7/17/14
Correspondence / Discussions with CEP Compilation of Correspondence through 12/1/2017 – Binder Documents 1-4 12/1/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 9/12/2017 – Binder Document 1-7 9/12/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 9/12/2017 9/12/17 SCE
Correspondence / Discussions with CEP Compilation of Correspondence through 6/12/2017 – Binder Documents 1-11 6/13/17 SCE
Correspondence / Discussions with CEP Compilation of Correspondence through 5/9/2017 – Binder Documents 1-9 5/9/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 4/3/17 4/5/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 4/3/2017 – Binder Documents 1-7 4/5/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 1/20/17 2/7/17 SCE
Correspondence / Discussions with CEP Compilation of Correspondence Binder Documents 1-15 2/6/17 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 10/25/16 11/7/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 10/25/16 – Binder Documents 1 to 6 11/7/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 9/1/2016 9/6/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 5/4/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 5/4/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 – Binder Documents 1 to 11 5/4/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 3/11/16 3/11/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 3/11/16 3/11/16 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 5/21/15 5/28/15 SCE
Correspondence / Discussions with CEP Compilation of correspondence through 5/21/15 Attachments 5/28/15 SCE
Correspondence / Discussions with CEP Communication with the Public through 10.06.2015 10/7/15 SCE
Correspondence / Discussions with CEP September 30, 2015 Update Letter from SCE VP Tom Palmisano 9/30/15 SCE
Correspondence / Discussions with CEP "Playbook" produced by Glenn Pascall on Bipartisan Policy Center/CEP joint meeting on 1/27 1/30/15 Glenn Pascall
Correspondence / Discussions with CEP SCE Response to Question from the Public 7/21/15 SCE
Correspondence / Discussions with CEP Oceanside Q&A addressing matters of interest to constituents of Honorable Jerry Kern, Councilmember, City of Oceanside (and CEP member) 3/27/15 Jerry Kern
Correspondence / Discussions with CEP Compilation of correspondence among members of the public, the CEP, and SCE 3/19/15 SCE
Correspondence / Discussions with CEP Letter to Senator Feinstein - 6/13/14 6/13/14 SCE
Correspondence / Discussions with CEP Letter to Chairman Landrieu and Ranking Member Murkowski - 6/13/14 6/13/14 SCE
Correspondence / Discussions with CEP A National Framework for Nuclear Waste Management 1/15/15 Glenn Pascall
Correspondence / Discussions with CEP Communication with the Public through 1/15/15 1/16/15 SCE
Correspondence / Discussions with CEP NRC Memo on Decommissioning Rulemaking 12/30/14 NRC
Correspondence / Discussions with CEP NRC Staff Recommendation EP Exemption Requests 12/17/14 NRC
Correspondence / Discussions with CEP Coamp Pendleton Appointment to CEP 1/16/15 USMC Camp Pendleton
Correspondence / Discussions with CEP NRC Fukushima Order Rescission 1 6/30/14 NRC
Correspondence / Discussions with CEP NRC Fukushima Order Rescission 2 6/30/14 NRC
Correspondence / Discussions with CEP Responses to Public Comment on the PSDAR and DCE - -
Correspondence / Discussions with CEP CEP Interim Assessment 8/19/14 David Victor & Tim Brown
Correspondence / Discussions with CEP Ted Quinn Comments on PSDAR - Ted Quinn
Correspondence / Discussions with CEP Gene Stone Comments on PSDAR - 8/26/14 8/26/14 Genestone
Correspondence / Discussions with CEP Garry Brown Comments on EIE - 9/2/14 9/2/14 Garry Brown
Correspondence / Discussions with CEP Ted Quinn Additional Comments on PSDAR - 8/25/14 8/25/14 Ted Quinn
Correspondence / Discussions with CEP Dan Stetson, Comments on PSDAR - 9/2/14 9/2/14 Dan Stetson
Correspondence / Discussions with CEP Email Threads and Correspondence - 5/6/14 5/6/14 - 5/6/14
Correspondence / Discussions with CEP Ray Lutz, Citizens' Oversight Projects - 7/4/14 7/4/14 Ray Lutz 5/22/14
Correspondence / Discussions with CEP Kent Cole, NAC International - 7/3/14 7/3/14 NAC International 5/22/14
Correspondence / Discussions with CEP Dan Dominguez, UWUA Local 246 6/3/14 6/3/14 UWUA 5/22/14
Correspondence / Discussions with CEP Donna Gilmore, SanOnofreSafety.org - 5/8/14 5/8/14 Donna Gilmore 7/17/14
Correspondence / Discussions with CEP CEP Questions and Answers on Decommissioning - 3/25/14 3/25/14 - 3/25/14
Correspondence / Discussions with CEP Discussion of Seismic Issues - 5/22/14 5/22/14 Dr. William Parker 5/22/14
Correspondence / Discussions with CEP Leone Grant - 7/30/14 7/30/14 Leone Grant
Correspondence / Discussions with CEP Chuck Hays - 7/31/14 7/31/14 Chuck Hays
Correspondence / Discussions with CEP Michael Snow - 8/4/14 8/4/14 Michael Snow
Correspondence / Discussions with CEP Roger Johnson - 7/15/14 7/15/14 Roger Johnson
Nuclear Fuel SONGS Used Fuel Management Defense in Depth White Paper 9/13/17
Nuclear Fuel Los Angeles Times Reporter Ralph Vartabedian, article on used nuclear fuel, July 2, 2017 7/02/17 SCE
Nuclear Fuel Los Angeles Times Reporter Ralph Vartabedian, article on used nuclear fuel, July 2, 2017 7/02/17 SCE
Nuclear Fuel Onsite Used Fuel Storage Safety – NEI July 2017 (pdf) 7/19/17 NEI
Nuclear Fuel U.S. Dry Storage Map (pdf) 5/24/16 SCE
Nuclear Fuel Used Fuel Management – NEI May 2016 (pdf) 5/24/16 SCE
Nuclear Fuel Evaluation of Removing Used Nuclear Fuel From Shutdown Sites – An Update – DOE, May 2016 (pdf) 5/24/16 SCE
Nuclear Fuel Dr. Ernie Moniz Speech (pdf) 4/16/15 Dr. Ernie Moniz 4/16/15
Nuclear Fuel CEP Letter to Joseph Street, California Coastal Commission 9/30/15 David Victor, Tim Brown, Daniel Stetson
Nuclear Fuel Notification published in Federal Register - NRC approved Holtec UMAX system for more stringent SONGS seismic criteria 9/5/15 Federal Register
Nuclear Fuel Moving SONGS spent nuclear fuel: the role of Consolidated Interim Storage (CIS) 8/25/15 David Victor, Tim Brown, Dan Stetson
Nuclear Fuel GAO Used Fuel Transportation (10/1/2015) 11/5/15 US Government Accountability Office
Nuclear Fuel Making Consolidated Interim Storage a Reality Update 11/5/15 David Victor, Tim Brown, Jerry Kern, Garry Brown
Nuclear Fuel Proposed Expansion of Dry Storage of San Onofre Used Nuclear Fuel 10/7/15 SCE
Nuclear Fuel SONGS Dry Cask Storage System Defense in Depth 7/23/15 Holtec 7/23/15
Nuclear Fuel Moving SONGS spent nuclear fuel away or: The need for a California Waste Strategy 4/14/15 David Victor
Tim Brown
Dan Stetson
4/16/15
Nuclear Fuel Two "Idea sheets" by Marni Magda on California solutions for used fuel storage. 1/1/15 Marni Magda
Nuclear Fuel White paper on a "National Framework for Nuclear Waste Management" by Glenn Pascall 1/15/15 Glenn Pascall
Nuclear Fuel Letter of intent from Waste Control Specialists LLC (WCS) to the NRC regarding the company's efforts to establish an interim consolidated private storage facility for used nuclear fuel in Texas 2/6/15 Waste Control Specialists LLC (WCS)
Nuclear Fuel Resolution by Andrews County, Texas, supporting the proposed WCS in Andrews County 1/20/15 Andrews County, TX
Nuclear Fuel Notification published in the Federal Register indicating that the NRC has certified Holtec's design for dry cask storage that SCE has selected for San Onofre 3/6/15 Federal Register
Nuclear Fuel Nuclear Waste Administration Act of 2015, a new bill focused on long-term used fuel storage, sponsored by Senator Dianne Feinstein and three other US Senators - -
Nuclear Fuel Oglesby - California's role in nuclear waste policy 1/27/15 California Energy Commission
Nuclear Fuel New Publication: CEP Chairman David Victor publishes report "Safety of long-term storage in casks: Issues for San Onofre" 12/9/14 David Victor
Nuclear Fuel Appendix to "Safety of long-term storage in casks: Issues for San Onofre - -
Nuclear Fuel SCE Fact Sheet - Used Nuclear Fuel Management 10/9/14 SCE
Nuclear Fuel Current Status for U.S. Nuclear Waste Policy - Peterson 5/6/14 Per F. Peterson 5/6/14
Nuclear Fuel Issues Involving Storage and Transportation of High Burnup Nuclear Fuel - Resnikoff 5/6/14 Marvin Resnikoff, Ph. D. 5/6/14
Nuclear Fuel Safe Used Fuel Solutions for SONGS - McMahon 5/6/14 Areva 5/6/14
Nuclear Fuel NRC Regulation of Spent Nuclear Fuel Storage and Transportation - Barto 5/6/14 NRC 5/6/14
Nuclear Fuel SCE Position Paper on High Burnup Fuel Storage and Transportation - SCE
Nuclear Fuel SCE Position Paper on Independent Spent Fuel Storage Installation Location - SCE
Nuclear Fuel Independent Spent Fuel Installation and Technology Options - 7/17/14 7/17/14 SCE 7/17/14
Nuclear Fuel Areva Position Paper on Facts about Canning High Burnup Fuel - Areva 5/22/14
Plant Security Dr. Ernie Moniz Speech 3/25/15 Dr. Ernie Moniz
Plant Security Summary of NAS Study on Terrorism (pdf) 11/1/12 The Natioinal Academy of Sciences 4/16/15
Seismic / Tsunami Seismic Constraints on the Architecture of the Newport-Inglewood/Rose Canyon Fault: Implications for the Length of Magnitude of Future Earthquake Ruptures. Published in Journal of Geophysical Research, February 2017. 3/13/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Continental shelf morphology and stratigraphy offshore San Onofre, California: The interplay between rates of eustatic change and sediment supply. Published in Marine Geology, 2015. 2/11/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Segmentation and step-overs along strike-slip fault systems in the Inner California Borderlands: implications for fault architecture and basin formation. Published in Applied Geology in California: Association of Environmental and Engineering Geologists, Special Publication Number 26, 2016. 2/11/2017 Dr. Neal Driscoll 2/16/17
Seismic / Tsunami Public Watchdogs blog post ‘Geologist Warns: A nuclear disaster at SONGS is unavoidable’ and email exchange with Charles Langley 2/11/2017 Public Watchdogs
Seismic / Tsunami SCE Position Paper on Tsunami Hazards Analysis - SCE
Emergency Planning SCE Submitted License Amendment for ISFSI Only Security Plan 12/19/2016 SCE 7/23/15
Emergency Planning SCE Submitted License Amendment for ISFSI Only Technical Specifications 2/15/2017 SCE 7/23/15
Emergency Planning SCE Submitted License Amendment for ISFSI-Only Emergency Plan 12/15/2016 SCE 7/23/15
Emergency Planning Sara Kaminske Emergency Planning 7/23/15 IPC 7/23/15
Emergency Planning NSIR/DPR-ISG-02 INTERIM STAFF GUIDANCE EMERGENCY PLANNING EXEMPTION REQUESTS FOR DECOMMISSIONING NUCLEAR POWER PLANTS 5/11/15 NRC
Emergency Planning June 4 letter from SCE Tom Palmisano to CEP members regarding an update on San Onofre's emergency plan 6/4/15 SCE
Emergency Planning SCE Fact Sheet - Emergency Planning During Decommissioning 10/9/14 SCE
Emergency Planning SCE Fact Sheet - Questions Regarding Emergency Plan Changes 10/9/14 SCE
Emergency Planning Status of SONGS Permanently Defueled Emergency Plan Submittal 10/9/14 SCE 10/9/14
Emergency Planning SCE Presentation - Emergency Planning for San Onofre 10/9/14 SCE 10/9/14
Emergency Planning Interjurisdictional Planning Committee Overview 10/9/14 IPC 10/9/14
Emergency Planning Reactor Decommissioning Emergency Planning Aspects, Joe Anderson, Chief Operating Reactor Licensing and Outreach Branch, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission 10/9/14 NRC 10/9/14
Emergency Planning Key Facts: San Onofre Emergency Planning During Decommissioning 6/1/14 SCE
Emergency Planning Letter from NEI President and Chief Executive Officer Marvin Fertel to Senators Boxer and Vitter - 6/3/14 6/3/14 NEI
Emergency Planning Letter from NRC Chairman Allison Macfarlane - 6/26/14 6/26/14 NRC
Emergency Planning Letter from NRC Chairman Allison Macfarlane - 7/24/14 7/24/14 NRC
Industry Examples California Actions on Nuclear Waste Policy 1/27/15 California Energy Commission (CEC) 1/27/15
Industry Examples Crystal River Unit 3 IFMP - 12/13/13 12/13/13 NRC
Industry Examples Kewaunee Power Station IFMP - 4/25/14 4/25/14 NRC

Ready to Share

This printable guide provides key information about Decommissioning in English and in Spanish.

Get Updates





Historical Timeline

See 60+ years of history, from the start of construction of Unit 1 in 1964 to today.

View timeline




CEP Meeting Materials CIS Development Projects: Waste Control Specialist presented by SCE (5/11/17) 5/11/17 CEP 5/11/17 CEP Meeting Materials CIS Development Project: Eddy-Lea Energy Alliance LLC & Holtec International (5/11/17) 5/11/17 CEP 5/11/17 CEP Meeting Materials CEP Meeting Presentation (5/11/17) 5/11/17 CEP 5/11/17 CEP Meeting Materials CEP Meeting Agenda (2/16/17) 2/16/17 CEP 2/16/17 CEP Meeting Materials CEP Meeting Transcripts (9/15/16) 9/15/16 CEP 9/15/16 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Transcripts (11/10/16) 11/10/16 CEP 11/10/16 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Transcripts (3/24/16) 3/24/16 CEP 3/24/16 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Transcripts (6/22/16) 6/22/16 CEP 6/22/16 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Presentation (11/10/16) 11/10/16 CEP 11/10/16 CEP Meeting Materials Decommissioning Update (11/10/16) 11/10/16 CEP 11/10/16 CEP Meeting Materials CEP Meeting Agenda (11/10/16) 11/7/16 CEP 11/10/16 CEP Meeting Materials Strategic Advocacy Plan for CIS (11/2016) 11/10/16 CEP 11/10/16 CEP Meeting Materials Decommissioning Update 9/15/2016 9/15/16 CEP 9/15/16 CEP Meeting Materials Environmental Update 9/15/2016 9/15/16 CEP 9/15/16 CEP Meeting Materials Dry Cask Storage of Used Nuclear Fuel - 9/15/2016 9/15/16 CEP 9/15/16 CEP Meeting Materials Steve Schroeter - Wheeler North Reef Update - 9/15/2016 9/15/16 CEP 9/15/16 CEP Meeting Materials CEP Meeting Agenda - 9/15/2016 9/15/16 CEP 9/15/16 CEP Meeting Materials Decommissioning Update - 6/22/2016 6/22/16 CEP 6/22/16 CEP Meeting Materials Robert Oglesby – California Energy Commission - 6/22/2016 6/22/16 Robert Oglesby 6/22/16 CEP Meeting Materials Jack Edlow – Transportation of Spent Nuclear Fuel - 6/22/2016 6/22/16 Jack Edlow 6/22/16 CEP Meeting Materials Allison Macfarlane – Integrating the elements of the back end of the fuel cycle - 6/22/2016 6/22/16 Allison Macfarlane 6/22/16 CEP Meeting Materials CEP Meeting Agenda - 6/22/2016 6/22/16 CEP 6/22/16 CEP Meeting Materials State Lands Commission's Role in SONGS Decommissioning 3/24/16 CEP 3/24/16 CEP Meeting Materials San Onofre Environmental Review & Permitting Process 3/24/16 CEP 3/24/16 CEP Meeting Materials Economic Impact Comparison Jan 2016 3/24/16 CEP 3/24/16 CEP Meeting Materials Decommissioning Update 3/24/16 CEP 3/24/16 CEP Meeting Materials CEP Meeting Transcript 11/5/15 11/5/15 CEP 11/5/15 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Agenda 3/24/16 3/24/16 CEP 3/24/16 CEP Meeting Materials CEP Meeting Transcript 7/23/15 7/23/15 CEP 7/23/15 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Agenda 11/5/15 11/5/15 CEP 11/5/15 CEP Meeting Materials CEP Meeting Agenda 7/23/2015 7/23/15 CEP 7/23/15 CEP Meeting Materials CEP Meeting Agenda 4/16/2015 4/16/15 CEP 4/16/15 CEP Meeting Materials CEP Meeting Transcript 4/16/2015 4/16/15 CEP 4/16/15 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Agenda 1/27/2015 1/27/15 CEP 1/27/15 CEP Meeting Materials CEP Meeting Transcript 1/27/2015 1/27/15 CEP 1/27/15 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Agenda 10/14/2014 10/14/14 CEP 10/14/14 CEP Meeting Materials SCE Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14 CEP Meeting Materials Areva Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14 CEP Meeting Materials Holtec Presentation CEP Special Meeting 10/14/2014 10/14/14 CEP 10/14/14 CEP Meeting Materials SONGS Units 2 & 3 - PDEP - LAR 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials SONGS Units 2 & 3 - PDEP - Exemption Request 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials NRC Interim Staff Guidance-Decommissioning 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Markey and Boxer to Macfarlane Correspondence 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Boxer to Macfarlane Correspondence 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Macfarlane to Boxer Correspondence 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Macfarlane to Markey Correspondence 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials CEP Meeting Agenda 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials CEP Meeting Transcript 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Transcripts CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Boron Levels in Spent Fuel Pools 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Extinguishing Zirconium Fire 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials Response to Inquiry Community Engagement Panel Regular Meeting October 9, 2014 Plant Water Supply 10/9/2014 10/9/14 CEP 10/9/14 CEP Meeting Materials CEP Meeting Draft Agenda 8/28/2014 8/28/14 CEP 8/28/14 CEP Meeting Materials CEP Meeting Transcript 8/28/2014 8/28/14 CEP 8/28/14 CEP Meeting Transcripts CEP Meeting Materials CEP Workshop Agenda 7/17/2014 7/17/14 CEP 7/17/14 CEP Meeting Materials DCE Executive Summary 7/17/2014 7/17/14 CEP 7/17/14 CEP Meeting Materials EIE Executive Summary 7/17/2014 7/17/14 CEP 7/17/14 CEP Meeting Materials DCE and EIE Assumptions 7/17/2014 7/17/14 CEP 7/17/14 CEP Meeting Materials SCE Final Draft IFMP 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Materials CEP comments on SCE draft IFMP 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Materials SCE Position Papers on ISFSI Location, High Burnup Fuel Storage and Transportation, and Tsunami Hazard Analysis 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Materials CEP Meeting Agenda 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Materials CEP Meeting Transcript 5/22/2014 5/22/14 CEP 5/22/14 CEP Meeting Transcripts CEP Meeting Materials CEP Meeting Adgenda 5/6/2014 5/6/14 CEP 5/6/14 CEP Meeting Materials Workshop Notes and Action Items 5/6/2014 5/6/14 CEP 5/6/14 CEP Meeting Materials CEP Meeting Agenda 3/25/2014 3/25/14 CEP 3/25/14 CEP Meeting Materials CEP Briefing Materials 3/25/2014 3/25/14 CEP 3/25/14 CEP Meeting Materials CEP Meeting Transcript 3/25/2014 3/25/14 CEP 3/25/14 CEP Meeting Transcripts CEP Meeting Minutes Meeting Minutes 11/10/16 6/22/16 SCE 6/22/16 CEP Meeting Minutes Meeting Minutes 6/22/16 6/22/16 SCE 6/22/16 CEP Meeting Minutes Meeting Minutes 3/24/16 3/24/16 SCE 3/24/16 CEP Meeting Minutes Meeting Minutes 11/5/2015 11/5/15 SCE 11/5/15 CEP Meeting Minutes Meeting Minutes 7/23/2015 7/23/15 SCE 7/23/15 CEP Meeting Minutes Meeting Minutes 4/16/2015 4/16/15 SCE 4/16/15 CEP Meeting Minutes Meeting Minutes 1/27/2015 1/27/15 SCE 1/27/15 CEP Meeting Minutes Meeting Minutes 10/14/2014 10/14/14 SCE 10/14/14 CEP Meeting Minutes Meeting Minutes 10/9/2014 10/9/14 SCE 10/9/14 CEP Meeting Minutes Meeting Minutes 8/28/2014 8/28/14 SCE 8/28/14 CEP Meeting Minutes Meeting Minutes 7/17/2014 7/17/14 SCE 7/17/14 CEP Meeting Minutes Meeting Minutes 5/22/2014 5/22/14 SCE 5/22/14 CEP Meeting Minutes Meeting Minutes 3/25/2014 3/25/14 SCE 3/25/14 Decommissioning Documents and Process California Coastal Commission (CCC) Costal Development Permit 12/4/2015 SCE Decommissioning Documents and Process NRC: Decommissioning Nuclear Power Plants 6/17 SCE Decommissioning Documents and Process NEI Fact Sheet – Decommissioning Nuclear Power Plants 8/1/16 NEI Decommissioning Documents and Process Advance Notice of NRC Decommissioning Rulemaking: Regulatory Improvement for Decommissioning Power Reactors 11/19/2015 NRC Decommissioning Documents and Process John Kotek letter to CEP 7/30/15 DOE Decommissioning Documents and Process Decommissioning Study Fact Sheet 11/5/15 SCE Decommissioning Documents and Process Full Economic Impact Analysis 11/5/15 Beacon Economics Decommissioning Documents and Process NRC Letter to SCE regarding approval of the San Onofre Irradiated Fuel Management Plan 8/19/15 NRC Decommissioning Documents and Process NRC Letter to SCE regarding acceptance of the Post-Shutdown Decommissioning Activities Report 8/20/15 NRC Decommissioning Documents and Process 1995 SONGS Geotech Report 7/21/15 SCE Decommissioning Documents and Process CCC CDP Waiver Staff Recommendations & Meeting Notice 3/5/15 2/26/15 California Castal Commission (CCC) Decommissioning Documents and Process SCE Submitted Post-Shutdown Decommissioning Activities Report 9/23/14 9/23/14 SCE 8/28/14 Decommissioning Documents and Process SCE Submitted Irradiated Fuel Management Plan 9/23/14 9/23/14 SCE Decommissioning Documents and Process SCE Submitted Decommissioning Cost Estimate 9/23/14 9/23/14 SCE Decommissioning Documents and Process Substance and Process at San Onofre: Panel Discussion with Invited Technical Experts and SCE on PSDARs, EIEs, and DCEs Introduction 7/17/14 7/17/14 SCE 7/17/14 Decommissioning Documents and Process SONGS Decommissioning Community Engagement Panel Charter 3/25/14 CEP Decommissioning Documents and Process SCE Decommissioning Core Principles and Values 1/1/14 SCE Decommissioning Documents and Process Executive Summary of San Onofre Irradiated Fuel Management Plan - SCE 5/22/14 Decommissioning Documents and Process SCE Final Draft San Onofre Irradiated Fuel Management Plan 5/15/14 SCE 5/22/14 Decommissioning Documents and Process Fact sheet with directions to meeting venue 5/15/14 SCE 5/22/14 Decommissioning Documents and Process Executive Summary SCE Draft San Onofre Decommissioning Cost Estimate - SCE Decommissioning Documents and Process SCE Draft Decommissioning Cost Estimate 5/21/14 SCE 8/28/14 Decommissioning Documents and Process Executive Summary of SCE Draft Environmental Impacts Evaluation 6/2/14 SCE Decommissioning Documents and Process SCE Draft Environmental Impact Evaluation 6/2/14 SCE 8/28/14 Decommissioning Documents and Process SCE Draft Post-Shutdown Decommissioning Activities Report 8/1/14 SCE Decommissioning Documents and Process Assumptions for SCE San Onofre Decommissioning Cost Estimate and Environmental Impacts Evaluation 7/18/14 SCE Decommissioning Documents and Process NRC Oversight of DCE, EIE, and PSDAR and What to Expect in the Coming Months and Years - Watson Presentation 7/17/14 NRC 7/17/14 Decommissioning Documents and Process EIE Development / Process - Leiba Presentation 7/17/14 URS 7/17/14 Decommissioning Documents and Process DCE Development / Process - Smith Presentation 7/17/14 Energy Solutions CB & I 7/17/14 Decommissioning Documents and Process California Senate Energy, Utilities & Communications Committee Hearing - Brown / Palmisano Presentations 8/12/14 SCE Decommissioning Documents and Process NRC Decommissioning Nuclear Power Plants Brochure - - Decommissioning Documents and Process NRC Frequently Asked Questions About the Waste Confidence Generic Environmental Impact Statement (GEIS) and Rulemaking - - All SCE Presentations to CEP Briefing on Economic Impact Study 11/5/15 SCE All SCE Presentations to CEP Decommissioning Update 11/5/15 SCE 11/5/15 All SCE Presentations to CEP CEP Presentation - Decommissioning Update 7/23/15 SCE 7/23/15 All SCE Presentations to CEP Emergency Planning and Preparedness Presentation 7/23/15 SCE 7/23/15 All SCE Presentations to CEP Dry Fuel Storage Defense in Depth 7/23/15 SCE 7/23/15 All SCE Presentations to CEP San Onofre Security Briefing 4/16/15 SCE 4/16/15 All SCE Presentations to CEP CEP Presentation - Decommissioning Update 4/16/15 SCE 4/16/15 All SCE Presentations to CEP Status of SONGS Permanently Defueled Emergency Plan Submittal 10/9/14 SCE All SCE Presentations to CEP SCE Presentation - Emergency Planning for San Onofre 10/9/14 SCE All SCE Presentations to CEP CEP Presentation - 8/28/14 8/28/14 SCE 8/28/14 All SCE Presentations to CEP CEP Presentation - 3/25/14 3/25/14 SCE 3/25/14 All SCE Presentations to CEP SONGS Decommissioning Project - 5/6/14 5/6/14 SCE 5/6/14 All SCE Presentations to CEP CEP Presentation - 5/22/14 5/22/14 SCE 5/22/14 All SCE Presentations to CEP Independent Spent Fuel Installation and Technology Options - 7/17/14 7/17/14 SCE 7/17/14 All SCE Presentations to CEP Overview of SCE's Draft EIE and DCE - 7/17/14 7/17/14 SCE 7/17/14 Correspondence / Discussions with CEP Compilation of correspondence through 9/12/2017 – Binder Document 1-7 9/12/17 SCE Correspondence / Discussions with CEP Compilation of correspondence through 9/12/2017 9/12/17 SCE Correspondence / Discussions with CEP Compilation of Correspondence through 6/12/2017 – Binder Documents 1-11 6/13/17 SCE Correspondence / Discussions with CEP Compilation of Correspondence through 5/9/2017 – Binder Documents 1-9 5/9/17 SCE Correspondence / Discussions with CEP Compilation of correspondence through 4/3/17 4/5/17 SCE Correspondence / Discussions with CEP Compilation of correspondence through 4/3/2017 – Binder Documents 1-7 4/5/17 SCE Correspondence / Discussions with CEP Compilation of correspondence through 1/20/17 2/7/17 SCE Correspondence / Discussions with CEP Compilation of Correspondence Binder Documents 1-15 2/6/17 SCE Correspondence / Discussions with CEP Compilation of correspondence through 10/25/16 11/7/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 10/25/16 – Binder Documents 1 to 6 11/7/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 9/1/2016 9/6/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 5/4/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 5/4/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 5/2/2016 – Binder Documents 1 to 11 5/4/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 3/11/16 3/11/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 3/11/16 3/11/16 SCE Correspondence / Discussions with CEP Compilation of correspondence through 5/21/15 5/28/15 SCE Correspondence / Discussions with CEP Compilation of correspondence through 5/21/15 Attachments 5/28/15 SCE Correspondence / Discussions with CEP Communication with the Public through 10.06.2015 10/7/15 SCE Correspondence / Discussions with CEP September 30, 2015 Update Letter from SCE VP Tom Palmisano 9/30/15 SCE Correspondence / Discussions with CEP "Playbook" produced by Glenn Pascall on Bipartisan Policy Center/CEP joint meeting on 1/27 1/30/15 Glenn Pascall Correspondence / Discussions with CEP SCE Response to Question from the Public 7/21/15 SCE Correspondence / Discussions with CEP Oceanside Q&A addressing matters of interest to constituents of Honorable Jerry Kern, Councilmember, City of Oceanside (and CEP member) 3/27/15 Jerry Kern Correspondence / Discussions with CEP Compilation of correspondence among members of the public, the CEP, and SCE 3/19/15 SCE Correspondence / Discussions with CEP Letter to Senator Feinstein - 6/13/14 6/13/14 SCE Correspondence / Discussions with CEP Letter to Chairman Landrieu and Ranking Member Murkowski - 6/13/14 6/13/14 SCE Correspondence / Discussions with CEP A National Framework for Nuclear Waste Management 1/15/15 Glenn Pascall Correspondence / Discussions with CEP Communication with the Public through 1/15/15 1/16/15 SCE Correspondence / Discussions with CEP NRC Memo on Decommissioning Rulemaking 12/30/14 NRC Correspondence / Discussions with CEP NRC Staff Recommendation EP Exemption Requests 12/17/14 NRC Correspondence / Discussions with CEP Coamp Pendleton Appointment to CEP 1/16/15 USMC Camp Pendleton Correspondence / Discussions with CEP NRC Fukushima Order Rescission 1 6/30/14 NRC Correspondence / Discussions with CEP NRC Fukushima Order Rescission 2 6/30/14 NRC Correspondence / Discussions with CEP Responses to Public Comment on the PSDAR and DCE - - Correspondence / Discussions with CEP CEP Interim Assessment 8/19/14 David Victor & Tim Brown Correspondence / Discussions with CEP Ted Quinn Comments on PSDAR - Ted Quinn Correspondence / Discussions with CEP Gene Stone Comments on PSDAR - 8/26/14 8/26/14 Genestone Correspondence / Discussions with CEP Garry Brown Comments on EIE - 9/2/14 9/2/14 Garry Brown Correspondence / Discussions with CEP Ted Quinn Additional Comments on PSDAR - 8/25/14 8/25/14 Ted Quinn Correspondence / Discussions with CEP Dan Stetson, Comments on PSDAR - 9/2/14 9/2/14 Dan Stetson Correspondence / Discussions with CEP Email Threads and Correspondence - 5/6/14 5/6/14 - 5/6/14 Correspondence / Discussions with CEP Ray Lutz, Citizens' Oversight Projects - 7/4/14 7/4/14 Ray Lutz 5/22/14 Correspondence / Discussions with CEP Kent Cole, NAC International - 7/3/14 7/3/14 NAC International 5/22/14 Correspondence / Discussions with CEP Dan Dominguez, UWUA Local 246 6/3/14 6/3/14 UWUA 5/22/14 Correspondence / Discussions with CEP Donna Gilmore, SanOnofreSafety.org - 5/8/14 5/8/14 Donna Gilmore 7/17/14 Correspondence / Discussions with CEP CEP Questions and Answers on Decommissioning - 3/25/14 3/25/14 - 3/25/14 Correspondence / Discussions with CEP Discussion of Seismic Issues - 5/22/14 5/22/14 Dr. William Parker 5/22/14 Correspondence / Discussions with CEP Leone Grant - 7/30/14 7/30/14 Leone Grant Correspondence / Discussions with CEP Chuck Hays - 7/31/14 7/31/14 Chuck Hays Correspondence / Discussions with CEP Michael Snow - 8/4/14 8/4/14 Michael Snow Correspondence / Discussions with CEP Roger Johnson - 7/15/14 7/15/14 Roger Johnson Nuclear Fuel SONGS Used Fuel Management Defense in Depth White Paper 9/13/17 From/Sender: MPR Associates, Inc. Nuclear Fuel Los Angeles Times Reporter Ralph Vartabedian, article on used nuclear fuel, July 2, 2017 7/02/17 SCE Nuclear Fuel Los Angeles Times Reporter Ralph Vartabedian, article on used nuclear fuel, July 2, 2017 7/02/17 SCE Nuclear Fuel Onsite Used Fuel Storage Safety – NEI July 2017 (pdf) 7/19/17 NEI Nuclear Fuel U.S. Dry Storage Map (pdf) 5/24/16 SCE Nuclear Fuel Used Fuel Management – NEI May 2016 (pdf) 5/24/16 SCE Nuclear Fuel Evaluation of Removing Used Nuclear Fuel From Shutdown Sites – An Update – DOE, May 2016 (pdf) 5/24/16 SCE Nuclear Fuel Dr. Ernie Moniz Speech (pdf) 4/16/15 Dr. Ernie Moniz 4/16/15 Nuclear Fuel CEP Letter to Joseph Street, California Coastal Commission 9/30/15 David Victor, Tim Brown, Daniel Stetson Nuclear Fuel Notification published in Federal Register - NRC approved Holtec UMAX system for more stringent SONGS seismic criteria 9/5/15 Federal Register Nuclear Fuel Moving SONGS spent nuclear fuel: the role of Consolidated Interim Storage (CIS) 8/25/15 David Victor, Tim Brown, Dan Stetson Nuclear Fuel GAO Used Fuel Transportation (10/1/2015) 11/5/15 US Government Accountability Office Nuclear Fuel Making Consolidated Interim Storage a Reality Update 11/5/15 David Victor, Tim Brown, Jerry Kern, Garry Brown Nuclear Fuel Proposed Expansion of Dry Storage of San Onofre Used Nuclear Fuel 10/7/15 SCE Nuclear Fuel SONGS Dry Cask Storage System Defense in Depth 7/23/15 Holtec 7/23/15 Nuclear Fuel Moving SONGS spent nuclear fuel away or: The need for a California Waste Strategy 4/14/15 David Victor
Tim Brown
Dan Stetson 4/16/15 Nuclear Fuel Two "Idea sheets" by Marni Magda on California solutions for used fuel storage. 1/1/15 Marni Magda Nuclear Fuel White paper on a "National Framework for Nuclear Waste Management" by Glenn Pascall 1/15/15 Glenn Pascall Nuclear Fuel Letter of intent from Waste Control Specialists LLC (WCS) to the NRC regarding the company's efforts to establish an interim consolidated private storage facility for used nuclear fuel in Texas 2/6/15 Waste Control Specialists LLC (WCS) Nuclear Fuel Resolution by Andrews County, Texas, supporting the proposed WCS in Andrews County 1/20/15 Andrews County, TX Nuclear Fuel Notification published in the Federal Register indicating that the NRC has certified Holtec's design for dry cask storage that SCE has selected for San Onofre 3/6/15 Federal Register Nuclear Fuel Nuclear Waste Administration Act of 2015, a new bill focused on long-term used fuel storage, sponsored by Senator Dianne Feinstein and three other US Senators - - Nuclear Fuel Oglesby - California's role in nuclear waste policy 1/27/15 California Energy Commission Nuclear Fuel New Publication: CEP Chairman David Victor publishes report "Safety of long-term storage in casks: Issues for San Onofre" 12/9/14 David Victor Nuclear Fuel Appendix to "Safety of long-term storage in casks: Issues for San Onofre - - Nuclear Fuel SCE Fact Sheet - Used Nuclear Fuel Management 10/9/14 SCE Nuclear Fuel Current Status for U.S. Nuclear Waste Policy - Peterson 5/6/14 Per F. Peterson 5/6/14 Nuclear Fuel Issues Involving Storage and Transportation of High Burnup Nuclear Fuel - Resnikoff 5/6/14 Marvin Resnikoff, Ph. D. 5/6/14 Nuclear Fuel Safe Used Fuel Solutions for SONGS - McMahon 5/6/14 Areva 5/6/14 Nuclear Fuel NRC Regulation of Spent Nuclear Fuel Storage and Transportation - Barto 5/6/14 NRC 5/6/14 Nuclear Fuel SCE Position Paper on High Burnup Fuel Storage and Transportation - SCE Nuclear Fuel SCE Position Paper on Independent Spent Fuel Storage Installation Location - SCE Nuclear Fuel Independent Spent Fuel Installation and Technology Options - 7/17/14 7/17/14 SCE 7/17/14 Nuclear Fuel Areva Position Paper on Facts about Canning High Burnup Fuel - Areva 5/22/14 Plant Security Dr. Ernie Moniz Speech 3/25/15 Dr. Ernie Moniz Plant Security Summary of NAS Study on Terrorism (pdf) 11/1/12 The Natioinal Academy of Sciences 4/16/15 Emergency Planning SCE Submitted License Amendment for ISFSI Only Security Plan 12/19/2016 SCE 7/23/15 Emergency Planning SCE Submitted License Amendment for ISFSI Only Technical Specifications 2/15/2017 SCE 7/23/15 Emergency Planning SCE Submitted License Amendment for ISFSI-Only Emergency Plan 12/15/2016 SCE 7/23/15 Emergency Planning Sara Kaminske Emergency Planning 7/23/15 IPC 7/23/15 Emergency Planning NSIR/DPR-ISG-02 INTERIM STAFF GUIDANCE EMERGENCY PLANNING EXEMPTION REQUESTS FOR DECOMMISSIONING NUCLEAR POWER PLANTS 5/11/15 NRC Emergency Planning June 4 letter from SCE Tom Palmisano to CEP members regarding an update on San Onofre's emergency plan 6/4/15 SCE Emergency Planning SCE Fact Sheet - Emergency Planning During Decommissioning 10/9/14 SCE Emergency Planning SCE Fact Sheet - Questions Regarding Emergency Plan Changes 10/9/14 SCE Emergency Planning Status of SONGS Permanently Defueled Emergency Plan Submittal 10/9/14 SCE 10/9/14 Emergency Planning SCE Presentation - Emergency Planning for San Onofre 10/9/14 SCE 10/9/14 Emergency Planning Interjurisdictional Planning Committee Overview 10/9/14 IPC 10/9/14 Emergency Planning Reactor Decommissioning Emergency Planning Aspects, Joe Anderson, Chief Operating Reactor Licensing and Outreach Branch, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission 10/9/14 NRC 10/9/14 Emergency Planning Key Facts: San Onofre Emergency Planning During Decommissioning 6/1/14 SCE Emergency Planning Letter from NEI President and Chief Executive Officer Marvin Fertel to Senators Boxer and Vitter - 6/3/14 6/3/14 NEI Emergency Planning Letter from NRC Chairman Allison Macfarlane - 6/26/14 6/26/14 NRC Emergency Planning Letter from NRC Chairman Allison Macfarlane - 7/24/14 7/24/14 NRC Industry Examples California Actions on Nuclear Waste Policy 1/27/15 California Energy Commission (CEC) 1/27/15 Industry Examples Crystal River Unit 3 IFMP - 12/13/13 12/13/13 NRC Industry Examples Kewaunee Power Station IFMP - 4/25/14 4/25/14 NRC

More information

Ready to Share

This printable guide provides key information about Decommissioning in English and in Spanish.