Key Takeaways
The SONGS CEP hosted a virtual meeting focused on dismantlement progress, encouraging news regarding the federal used fuel management program, and the San Onofre nuclear plant site’s ability to withstand extreme climate events such as El Nino.
Joe Nowak, Executive Sponsor, San Onofre Decommissioning Solutions general contractor, provided updates on SONGS safety performance, culture and continuous improvement, current and planned decommissioning activities, waste management, and environmental stewardship. Ninety percent of the total project is complete with Unit 3 containment interior demolition well underway. Both Unit 2 and 3 containment domes are expected to commence exterior demolition in 2027, and the current phase of dismantlement will be complete by year-end 2028.
Nowak also discussed the recent notifications to the San Diego Regional Water Quality Control Board and NRC following two recent unintended wastewater discharge events. On September 23, 2026, approximately 5,000 gallons of demolition wastewater entered the Unit 2 storm drain system, discharging through the offshore conduits to the ocean. On November 3, approximately 900 gallons of wastewater spilled on an asphalt surface when a hose failed. In both cases, pH levels exceeded permit levels prompting notifications, but there was no risk to public health or safety. SCE takes any permit exceedance very seriously and will complete cause evaluations and corrective actions to prevent reoccurrence. Nowak also provided an update regarding the recent penetration of a wall in a basement below the water table. Groundwater from the basement is being included in batch releases which will increase in volume and frequency until the hole is repaired. Overall, approximately one million gallons of water will be processed and released, with a focus on adjusting pH, and ensuring total suspended solids are within regulatory limits (tritium levels are a small fraction of regulatory limits). All releases remain within safe regulatory limits.
CEP Chair, Dan Stetson provided updates regarding the federal used fuel management program, and recent constructive hearings in the House and Senate committees of jurisdiction, noting bipartisan supporting for Nuclear Lifecycle Innovation Campuses (NLICs) at both hearings, and advocated for the legislation needed to break Yucca Mountain’s exclusivity as only authorized repository site. Stetson was also a guest speaker at Rep. Mike Levin’s news conference on NLICs, and the Congressman’s SONGS Task Force Report 2.0 hosted at SONGS on October 28. SCE President and CEO Steve Powell, Orange County Supervisor and Spent Fuel Solutions Co-Chair Katrina Foley also provided remarks regarding the safe storage of the used nuclear fuel at SONGS and the potential solutions to removing the fuel from the site.
Read-only content in the presentation includes an update from Spent Fuel Solutions coalition and information regarding improvements to the SONGS public walkway, Gunite slope repairs, batch releases, tritium monitoring, Kelvin waves, and sea level rise.
Meetings MAY be recorded only if the presenter enables the recording feature AND initiates recording. If the meeting is being recorded, you will be warned and you may either consent to recording by staying on the call or hang up and contact meeting host.
New Microsoft Teams security feature is now required for external participants. When you join the meeting, you will be asked to type in the characters being displayed and then hit submit. You will then be granted access. Below is a screenshot example. Please refer to pages 6 and 7 of the “Instructions for joining Microsoft Teams” located in the meeting materials list at right for details.
How to Submit a Question/Comment
Early submittal of questions/comments before a CEP meeting increases the likelihood of a response during the hour long facilitated public dialogue portion of the meeting.
Questions and comments submitted in advance of the meeting and related to agenda topics will be—to the greatest extent possible—addressed in the presentation and/or discussed during facilitated public dialogue or, if necessary, responded to via email following the meeting.
Questions and comments received via NUCCOMM and related to agenda topics will be addressed first; questions on broader topics received during the public comment period will be addressed subsequently.
To submit questions/comments during a CEP meeting, use the CEP Comment Form link (if attending virtually) or use the hardcopy CEP Question/Comment Cards (if attending in-person) available at the registration table near the facility entrance.
Questions and comments will be added to the queue in order of receipt.
Questions and comments related to the meeting agenda topics will be —to the greatest extent possible—addressed during facilitated public dialogue or, if necessary, responded to via email following the meeting.
Victor Cabral and Martha McNicholas will facilitate the public dialogue portion of the meeting.